West Vancouver V7V 2H5 · Signature · prepared by Rowan Ashby · last visit 14 Apr 2026 · record updated 4 days ago
1994
Built
3,650
Square feet
35
Things on the record
92%
Captured
What needs attention2
Gutters and downpipesWhole house · your advisor flagged it: Downpipe is discharging against the foundation; assess before the wet season. · Water tracking behind the fascia at the north-east corner. · last done 20 Oct 2025 · next due 20 Oct 2026needs attention
DishwasherKitchen · Bosch SHPM88Z75N · your advisor flagged it: Water staining on the toe kick; gasket or inlet valve. · Slow leak from the door gasket, lower left corner.needs attention
Location3
Survey planOn file · BCLS survey 2019; no encroachments.good
Perimeter drainAround the foundation · Camera-scoped 2024; partial silt in the north run. · last done 2 Oct 2024 · next due 15 Oct 2026fair
DrivewayFrontgood
The land it sits on: parcel, lot, drainage and access.
Exterior5
RoofWhole house · last done 20 Oct 2025 · next due 20 Oct 2026good
Gutters and downpipesWhole house · your advisor flagged it: Downpipe is discharging against the foundation; assess before the wet season. · Water tracking behind the fascia at the north-east corner. · last done 20 Oct 2025 · next due 20 Oct 2026needs attention
SidingWhole house · Repaint due within two years; south face fading.good
WindowsWhole house · last done 12 May 2026good
Rear deckRear, off the kitchen · Two boards soft at the stair landing.fair
Roof, gutters, cladding, windows, decks and doors.
Appliances7
RefrigeratorKitchen · Sub-Zero 648PRO · last done 2 Mar 2026 · next due 2 Mar 2027good
RangeKitchen · Wolf DF366good
DishwasherKitchen · Bosch SHPM88Z75N · your advisor flagged it: Water staining on the toe kick; gasket or inlet valve. · Slow leak from the door gasket, lower left corner.needs attention
HRVMechanical room · Lifebreath 155 MAX · last done 14 Apr 2026 · next due 14 Oct 2026good
Furnace, heat pump, thermostats and ventilation.
Plumbing4
Water heaterMechanical room · Rheem Performance Platinum PROG50-42N · Bulletin: anode inspection due now on softened water. · last done 5 Sep 2025 · next due 5 Sep 2026fair
Main water shutoffMechanical room, left of the heatergood